Why one quote rarely fits two events
People often ask me for a single day rate for live sound, and I understand why. Budgets are set early and a figure makes planning easier. The difficulty is that two events with the same date and the same headline act can need very different amounts of work. A singer with a guitar in a village hall and a five-piece band in a marquee are both described as a gig, yet the second needs more microphones, more monitor mixes, more cable and more time to tune the system before anyone walks in.
So when we quote, we start from the event rather than from a standard package. The price reflects the engineer's time, the equipment that has to travel, and the hours the crew must be on site before and after the performance. Those three things move together, and most of what follows in this guide explains how each one behaves as a booking changes shape.
The engineer and the hours behind the show
The largest part of most quotes is people. A front-of-house engineer is not only paid for the two hours the band plays. There is the planning conversation beforehand, the input list and stage plan, the load-in, the system check, the line check, the soundcheck, the show itself and the load-out. A short set can sit inside a long day, and the length of that day is what we price, not the length of the music.
A second engineer for monitors is a separate cost, and it is worth asking whether you need one. A small stage with two or three wedges can often be run from the front-of-house desk. Once performers want individual mixes, or in-ear systems are involved, a dedicated monitor engineer keeps the show calm and the front-of-house mix undisturbed.
- Planning and input list preparation before the day
- Load-in, system setup and tuning
- Soundcheck and the performance itself
- Load-out and return of equipment
Equipment, channel count and microphone choices
Equipment cost follows the size of the job. A modest system for a room of a hundred people is a different proposition from a rig that has to cover a field. The number of channels matters too, because every drum microphone, vocal and instrument line adds a stage input, a cable run and a decision for the mixer. A full band with a drum kit can use more than twenty channels before anyone adds a choir or a brass section.
Microphone planning sits inside that cost. Wireless microphones need frequency coordination and spare batteries, and they cost more to supply than wired ones. If a speaker, a presenter or a quiet acoustic act is involved, choosing the right microphone for each voice is often worth more than adding speakers. We say so when it applies, even when it makes the quote smaller.
The room, the outdoors and the schedule
Where the sound happens changes the price in quiet ways. A hard-walled hall with a long reverberation needs more careful tuning and sometimes more speakers placed closer to the audience. An outdoor stage loses sound to the open air, and wind, rain cover and power distribution all become part of the plan. Access matters as well: a venue up two flights of stairs with no lift adds loading time, and loading time is paid time.
Schedule is the other quiet driver. A late finish means a late load-out, and an early start means an early setup. Back-to-back acts with a short changeover need more preparation than a single band on a long evening. If the running order is flexible, tell us. Moving one act by an hour can save a crew call without changing the experience for the audience.
- Reverberant rooms and open-air stages need extra tuning time
- Stairs, distance from the van and power supply affect setup
- Short changeovers between acts need more preparation
What a written quotation should show
Whoever you ask, a good quotation says what is included in plain words. It should name the engineer or engineers, the hours covered, the equipment supplied and what happens if the event overruns. It should also say what is not included, such as a venue's own house system, a stage, or extra crew for lifting. If a line in a quote is unclear, ask about it before you accept, because it is easier to adjust on paper than on the evening.
Our prices page sets out typical ranges for each service, and the written quotation we send after an enquiry is the figure that counts. It follows the details you give us: the room, the number of performers, the timings and the kind of event. Payment is by invoice and bank transfer, and cancellations follow the payment and refund policy, so there is nothing to find in small print later.
Ways to keep the cost sensible without losing quality
There is no need to cut corners to keep a budget in order. The most useful saving is information. Send a stage plan and an input list early, even a rough one, and the engineer arrives with the right equipment instead of a spare of everything. Tell us who is speaking and who is singing, whether there are backing tracks, and whether anyone wants in-ear monitoring. Each answer removes a guess, and guesses are expensive.
It also helps to decide what matters most to the evening. If clear speech is the priority, spend on microphones and placement. If it is a loud, tight band sound, spend on system size and tuning time. Trying to have everything at once is what pushes quotes upward, and a short conversation usually finds a sensible middle.
- Send a stage plan and input list as early as you can
- Say whether monitors or in-ears are needed
- Decide whether speech clarity or sheer volume comes first
- Share the running order and any flexibility in it
Live sound is priced on the engineer's hours, the equipment the event truly needs and the conditions of the room or field, and each of those can be explained line by line. If you are planning an evening this season, send us the details through the contact page and we will reply with a written quotation. Ask questions about anything in it. A clear price makes for a calmer event.